Summary scope of work
Item by item: what is included in each stage, what are the material variants, and how the three turnkey finishing packages differ.
Shell condition closed
This stage defines the construction quality of the investment. The use of certified C24 wood and Fermacell boards indicates a high standard of the frame, exceeding standard market solutions.
Foundation
Structure (frame)
Roof
Facade and joinery
Developer finish
Key stage for energy efficiency and user comfort. Includes full insulation, installation distribution, and surface preparation for finishing.
Thermal and acoustic insulation
Internal installations
Interior finishing (drywall)
Brands given as examples, equivalents with no lower parameters are allowed. Bory Home Dom Deweloper Sp. z o.o., KRS 0001182166, NIP 8971956515, REGON 542155705.
Always at your disposal
Call the Bory Home headquarters — we answer at any time and will arrange a conversation with an advisor. Prefer writing? We respond by email.
One number for Bory Home, available 24/7. We will answer technical questions, send the current offer, and arrange a conversation with an advisor.
Plan with marked changes, question about the plot or documents — write, and the advisor will respond on a business day.